🥧 Pie Charts
1 exam question type, fully solvedA pie chart splits a whole into slices. The whole circle is BOTH 100% and 360° — so every slice has a percent AND a matching angle, and you can switch between them freely.
Because , every of the pie is worth .
• Percent → angle: (e.g. ).
• Angle → percent: , or .
• Value of a slice: — turn the percent into a fraction first.
• Find the total from one slice: if a known amount is a known percent, . Drop to first, then scale to .
Budget Allocation — click a sector
DI Questions
Q1. What is the central angle for Education (30%)?
Q2. Housing is what percentage more than Savings?
Q3. If total budget is ₹1,20,000, what is the Food allocation?
A sector that is 30% of the pie has a central angle of °.
Q1A sector is 30% of a pie. Its central angle is:
Q2A sector’s central angle is 72°. Its percentage is:
Q3If 15% of a budget = ₹3,00,000, the total budget is:
Real exam questions — Pie Charts
1 question types · 4 solved examples from real SSC papersThe whole circle is both 100% and 360°, so 1% = 3.6°. Convert percent ↔ angle, and use one known slice to unlock the total.
- Percent → angle: . (e.g. .)
- Angle → percent: , or .
- Value of a slice: (as a fraction).
- Find the total from one slice (unitary method): if a known amount equals a known percent, then total . Drop to first, then scale to .
A pie chart of a family budget gives these percentages:Item % of budget Food 30% Rent 25% Travel 15% Savings 20% Others 10%
What is the central angle of the “Food” sector?
In the same budget pie chart:Item % of budget Food 30% Rent 25% Travel 15% Savings 20% Others 10%
If the total monthly budget is ₹1,20,000, how much is spent on Rent?
A pie chart shows how 2,500 laptops sold split across companies:Company % of laptops A 24% B 20% C 18% D 22% E 16%
What is the difference between the number of laptops sold by Company A and Company C?
A pie chart shows construction costs. The “Steel” sector is 15% of the total, and ₹3,00,000 was spent on Steel.Item % of cost Cement 20% Steel 15% Bricks 12% Labour 33% Sand 20%
What is the total construction cost?
